Construction of agricultural distillery and biogas plant has started in 2015. We installed equipment for preparation material to the propagation and fermentation technological line. Distillation line has been adjusted to structure to develope space for fittings and armatures like 100HSP pumps, collectoring tanks, heat exchanger WWZ, mixers and pipe lines. Construction of biogas plant connected to distillery was carried out at the same time. The main object are the two radial fermenters with heating coil and MWS mixers to homogenousing mixture inside. Obtained biogas is puryfing from contamination and transporting to the scrubber.